The site is surveyed and marked for excavation according to the size and shape selected. |
|
|
|
|
Actual digging begins after insuring that all electrical and other utilities are clear from the pool area. |
|
|
|
|
The excavation continues according to the depths specified by the blueprints. |
|
|
|
|
Piping & placing of plumbing components & other built-in equipment follows excavation just prior to beginning the steel framing. |
|
|
|
|
Long round steel reinforced rods are bent and shaped against the floor and walls of the excavation. |
|
|
|
|
Once inspected by the city, the pool is ready for concrete to be placed over the steel web. |
|
|
|
|
Decorative tile is applied at the waterline to protect pool from oil and water evaporation stains. |
|
|
|
|
Decking and a final plaster coat is applied to form a smooth interior finish over the cured concrete shell. |
|
|
|
|
The pump and filter are installed to prepare the swimming pool for the final step -- water. |